Scout one done. Had to rem out to one and one quarter inch two holes. Now the spare tire carrier can be mounted.
Scout two done. Fuel tank out. Ready to go to the shop and be boiled out.
Scout three done. Install cigarette lighter. As this Scout never had one. Next fix horn button. Next fix door lock assembly. Next adjust drivers door so it closes correctly.. Just needs to put in door seals.
Scout four not done but several projects done. Young Austin is learning. First mount power steering bracket and pump. Next R&R water pump. Next mount coil. Next R&R U Joints. Out with the old in with the new. And a forceful PUT ON YOUR SAFETY GLASSES. So metal chips or the clips that hold the U Joints in don't take your eye out. Next install rear drive shaft.
Done 1520 hrs.
Fun food work.
Meeting work party Grapevine Chapter. 11 November.
- Big Ed
- No limits

- Posts: 245
- Joined: Thu Jan 19, 2017 8:01 pm
- Location: Fresno, CA
- Vehicle(s): C1300 and 1110D
Re: Meeting work party Grapevine Chapter. 11 November.
John I wanted to go down and look at the engines, but my truck had a thunka thunka thunka on takeoff from a stop. Figured it out, transfer case mounting bolts had backed off. Look in my truck thread.
Looks like a lot was accomplished.
Looks like a lot was accomplished.
64 C1300 4X4, 345, T34, T18, NP202, D70F with ARB & 35 spline Chromoly axles, RA15 with Detroit Locker, 41" Iroks, front & rear PTO winches, recent makeover.
-
Big John
- No limits

- Posts: 244
- Joined: Wed Jan 25, 2017 8:13 pm
- Vehicle(s): 73 Scout 11 4X4, 71, 72, 73 Traveletes all 4X4's 3 IH Garands, IH refrierator And?
Re: Meeting work party Grapevine Chapter. 11 November.
Yes got a lot done.
Engine still here. I am now a little more mobile, bit can not do heavy things.
Engine still here. I am now a little more mobile, bit can not do heavy things.